Project Scope
Stellar Energy designed and installed this central utility plant
for Bayer to provide chilled water to a corporate campus. The
chilled-water distribution loop also serves other pharmaceutical
applications. The system is a primary, secondary and tertiary
system utilizing variable frequency drives (VFDs) to provide
chilled water on demand. Stellar Energy provided design,
construction, engineering, equipment procurement, mechanical
engineering and refrigeration services.