Location
Arlington, Arizona
Project Scope
Stellar Energy designed and built a turbine inlet air chilling (TIAC) system on a combined-cycle power plant. The system included industrial refrigeration equipment, cooling towers, coils, and chilled-water distribution piping. The facility contains a central industrial refrigeration system with packaged centrifugal chillers and a primary-secondary chilled-water distribution loop.